Tratayén - MEGA Gas Pipeline
Open crossing of the southern tributary of the Neuquén River
Construction of the diversion channel, trench excavation and assembly of concrete pipe. Some 52,000 m3 of soil were moved, while the total weight of the concrete pipe column came to 110 tons.