Filter by content
Showing 6 to 453 publications
Techint E&C incorporates the first 3D concrete printer in Argentina!
The tests were successfully carried out at TEPAM, the company's Logistics Center in General Pacheco, Buenos Aires. The initiative marks a new step forward toward more efficient, safe and sustainable processes in industrial construction.
Techint E&C celebrates the Cultural Diversity Month
Two expatriate employees share their stories, which reflect the value of multiculturalism as a driver of learning, integration and growth.
The first automatic welding operation on the main line was completed in the VMOS Project
The Vaca Muerta Sur Oil Pipeline, locally known as Vaca Muerta Oleoducto Sur or simply VMOS, has hit a new milestone near Chelforó in the province of Río Negro, Argentina. There, the first automatic welding operation was successfully carried out on the 437-km-long pipeline.
Volunteers in Action: Committed to making a difference in the Pesquería community
More than 100 people joined forces to help revamp secondary School No. 145 “Profesor José Mario Elizondo Montalvo” in Nuevo León, in Mexico.
Techint E&C and TAKRAF Group will be present at Arminera 2025
From May 20 to 22, Techint Engineering and Construction will participate at Arminera 2025 in La Rural, Buenos Aires, sharing stand with TAKRAF Group, a global leader in providing innovative solutions for mining, bulk material handling and minerals processing.
DUPLICAR Project Module II: the Techint–SACDE joint venture has completed this crucial phase ahead of time
The construction of Module 2 of the DUPLICAR project for Oleoductos del Valle (Oldelval)—which aims to double crude oil transport capacity from Vaca Muerta—has finished ahead of schedule and is already up and running.