Filter by content
Showing 6 to 422 publications
Reversal of Northern Gas Pipeilne: Techint Sacde consortium charged with lines two and three
The joint venture Unión Transitoria de Empresas (UTE) has been awarded the contract to build a pipeline that will supply the provinces in northern Argentina with gas from Vaca Muerta, substituting gas imported from Bolivia, where production is already registering a major decline.
“The most important thing is to do what you really want, to be focused and always keep learning”
Lily Núñez Letelier is the first female machinery operator at the Northern District Desalinated Water Supply Project (SADDN), in Chile. “My experience is a great option for anyone who didn’t go to college, but can take a course and learn a trade.”
Phase to transport pipes to C20+ successfully completed
With over 2.5 million km covered in 5,610 trips, the pipe transport phase for this project was successfully concluded without any deviations. The use of new technology to evaluate truck driver reaction capacity, added to a positive reinforcement campaign and incentives, were just some of the successful strategies employed by the company.
Innovation driving growth and powering competitiveness
Techint Engineering & Construction held its fourth edition of its Innovation Day in Buenos Aires Convention Center, an event attended in person by over 200 people, while another 650 logged on from around the world to watch it streamed.
A generation of giants makes its appearance at the Southeast Gateway Project in Mexico
These massive pieces of equipment are the turbochargers, the heart of the Compression Station in Tuxpan.
Preparing for the Energy Transition
The first Technical Workshop for employees from different engineering specialties was held in Buenos Aires as a three-day event featuring speakers from the Energy Transition team and other areas, including experts who traveled especially to Argentina from Spain and Italy.